Results 1 to 3 of 3

Thread: Cut-Off by Period

  1. #1
    Join Date
    Nov 2013
    Location
    South America
    Posts
    7

    Default Cut-Off by Period

    Dear All;

    I am curious with the variable cut-off grade applied by PO to the ore material that is entering to the process.

    I thought, I would like to report the Minimum Grade that feed the process, it could be an aproach of the cut-off used in every period, but at this point Im a little confused on getting minimum values from the outputpath.

    Cheers

    Carlos

  2. #2
    Join Date
    Jun 2005
    Location
    Brisbane
    Posts
    109

    Default Reporting the Minimum Grade per Period

    Quote Originally Posted by CarlosD View Post
    Dear All;
    I thought, I would like to report the Minimum Grade that feed the process, it could be an aproach of the cut-off used in every period, but at this point Im a little confused on getting minimum values from the outputpath.
    Hi Carlos,
    we are currently releasing a new version of OPMS (version 2.0) that has a new reporting function as follows ...

    Min(FieldName) - Returns the minimum field value (output path field, principal field or main database field)

    If you use this in the results expression of a row in a report, it should return the smallest value of the steps in each period that satisfy any filters you may have assigned to the row.

    The new version should be publically available next week and has lots of new functionity, including several new report writer expressions.

    Cheers, Alun

  3. #3
    Join Date
    Nov 2013
    Location
    South America
    Posts
    7

    Default

    Quote Originally Posted by aphillips View Post
    Hi Carlos,
    we are currently releasing a new version of OPMS (version 2.0) that has a new reporting function as follows ...

    Min(FieldName) - Returns the minimum field value (output path field, principal field or main database field)

    If you use this in the results expression of a row in a report, it should return the smallest value of the steps in each period that satisfy any filters you may have assigned to the row.

    The new version should be publically available next week and has lots of new functionity, including several new report writer expressions.

    Cheers, Alun

    Thanks Allun,
    That would be great!!!

Similar Threads

  1. Period solids as 1 solid
    By beusg in forum OPMS
    Replies: 6
    Last Post: 02-Jul-2016, 01:11 PM
  2. Period progress by Resource
    By Lebleu in forum XPAC
    Replies: 1
    Last Post: 15-Oct-2007, 10:20 AM
  3. Welcome to Open Cut Design Forum!
    By Cristian Englert in forum XPAC Open Cut
    Replies: 0
    Last Post: 28-Jun-2007, 09:05 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •